Home AP1-88/80 AP1-88/100 CC5 Finger Trouble Griffon2000TD Griffon8100TD SR.N2 SR.N4 SR.N5 SR.N6 SR.N6 Mk6 BH.7 SEDAM N300
General Specifications Hull Plan Duct Plan Skirt Plan Parts List Gallery Other sites

Griffon 2000TDX - 1/10 scale

Apply PVA glue to each side of the four bulkheads (B) and to the bottom of the side panels (C). Position the side panels so that the dashed lines on the inner face of the side panels line up with the bulkheads and the bottom of the side panels lines up with the dashed lines along the edge of the cabin floor (A). Pin the side panels in place and remove the pins when the glue is dry.
1. Cabin floor
2. Cabin floor
3. Bulkheads
4. Bulkheads
5. Side beams
6. Side beams
7. Forward and rear decks
8. Completed centre section
9. Side decks
10. Cabin
11. Lift duct
Side beams.